EV charger installation in Chorley, Leyland and Buckshaw.
Home charge points supplied, installed, tested, certified and notified. I will check your supply and your board before quoting, so the price you get is the price you pay.
Getting a charger fitted?
Tell me roughly where it needs to go.
Get a free quote Free survey, and I will tell you if your board needs work first.Supply checked first
I look at the board and the main fuse before quoting, not after.
DNO notification included
Notifying the network operator is part of the job.
Certified and tested
Full certification, and the earthing arrangement done properly.
Neat cable runs
Clipped, contained and routed to look deliberate rather than improvised.
What the installation involves.
More than screwing a box to a wall. Most of the job is making sure the supply behind it is up to the work.
Get a price for your installChecking what you have got
Main fuse rating, consumer unit capacity, spare ways and the existing earthing arrangement. Roughly half the quotes I give include something that needs sorting first, and it is better to know that on day one.
The charge point itself
Happy to fit whatever you have chosen, or to recommend. Zappi, Ohme, Hypervolt and Easee all do a good job with slightly different strengths around solar, tariffs and app control.
Earthing and PEN fault protection
The bit nobody mentions in the advert. Most UK homes use a PME earthing arrangement, which needs specific protection before you can safely charge a car outside. Some chargers have it built in and some need a separate device.
Load management
If the supply is tight, a load balancing device lets the charger back off when the shower and the oven are on instead of tripping the main fuse. Cheaper than upgrading the supply.
The cable run
Clipped, contained or buried depending on the route. Through a wall, along a fascia, under a drive. Priced by the metre and by how awkward it is, and I will tell you which before I start.
Testing, certifying and notifying
Circuit tested, certificate issued, and the installation notified to the network operator as required. All included.
Workplace charging
Multiple points for staff or fleet vehicles, with load management across the site so they do not all draw full power at once.
Grants, tariffs and whether it is worth it.
The old grant for homeowners with off-street parking closed some time ago, but support still exists for flats, rental properties and workplaces. Eligibility changes, so it is worth checking the current position on the government site before assuming either way — I will point you at it rather than guess.
The bigger saving is usually the tariff. Overnight EV rates are a fraction of the day rate, and a charger that talks to your tariff and schedules itself is where most of the money is. That is worth more thought than which brand goes on the wall.
If you have solar, some units will divert surplus generation into the car rather than exporting it. Worth mentioning when you enquire, because it narrows the choice of charger considerably.
Worth knowing before you buy
- Check whether your chosen charger has PEN fault protection built in.
- Check the app actually supports your energy tariff, not just smart scheduling in general.
- Measure the run from the board to the parking space — it is the main cost variable.
- If you have solar, say so early; it rules several units in and out.
- A three-pin granny cable is a stopgap, not a charging solution.
How an EV install goes.
Usually done and dusted inside a day.
Survey
Board, main fuse, earthing and the cable route, either in person or from photos for simple jobs.
Fixed quote
Including the unit, the run, any board work and the notification. Nothing added later.
Installation
Typically three to four hours. Power off for part of it while the circuit is connected.
Tested and handed over
Circuit tested, app set up with you, certificate issued and the DNO notified.
EV charging questions.
If yours is not here, ring and ask.
How long does an EV charger installation take?
Most take around three to four hours where the consumer unit has spare capacity and the cable run is straightforward. Longer if the board needs upgrading first, or if the run has to go under a drive or round the back of the house.
Tethered or untethered?
Tethered means the cable is attached to the unit, which is quicker day to day and tidier if you only ever charge one car. Untethered means you plug your own cable in, which is more flexible if you change cars or want to charge a visitor's. Neither is wrong.
Do I need to tell the electricity network?
Yes, and I handle it. Home charge points have to be notified to the distribution network operator. It is part of the job, not an extra.
What if my fuse box is too old?
It happens, particularly in older properties. A charge point needs its own protected circuit, and some older boards have neither the space nor the protection for one. I will check before quoting so you know up front rather than halfway through.
Tell me about the job.
A few details is plenty. I'll come back to you, usually the same day. If it's urgent, ring instead.
07572 642795