NAPIT registered  ·  TrustMark 3626227  ·  Fully insured Chorley, Leyland & across Lancashire

Commercial electrician for Chorley, Leyland and Lancashire.

Shop and office fit-outs, LED upgrades, emergency lighting, fire alarms and the periodic testing that comes with running a premises. Work planned around your trading hours, not mine.

What do you need?

Pick the closest one and I will come back to you.

Get a free quote Free site visit and a fixed price before anything starts.

Planned around trading

Evenings, early starts and quiet days where the job allows.

One point of contact

You deal with me, not a call centre and a rotating crew.

Certification that stands up

Reports your insurer and your landlord will accept.

Fixed prices

Priced properly up front so there is no argument at invoice stage.

Commercial work I take on.

Shops, offices, salons, pubs, takeaways, gyms, surgeries, care homes and light industrial units across the Chorley and Leyland area.

Talk to me about your premises

Fit-outs and refurbishments

Full first and second fix for new premises or a change of use. Power, data containment, lighting design, tills, signage supplies and air conditioning isolators. I will work to your shopfitter's programme and hand over a complete set of certificates at the end.

LED lighting upgrades

Swapping fluorescent and halogen for LED usually pays for itself faster than people expect, particularly anywhere the lights are on twelve hours a day. Worth doing properly with the right colour temperature and control gear rather than the cheapest panels available.

Emergency lighting

Design, installation and the testing regime that follows. Monthly function tests and the annual full duration test, recorded in a logbook that will stand up to inspection.

Fire alarm systems

Installation, extension and periodic servicing under BS 5839, including upgrading older systems that have been added to over the years without anyone revisiting the design.

Commercial EICRs and PAT

Periodic inspection of the fixed installation, and portable appliance testing for everything plugged into it. Both scheduled to keep you compliant rather than as an emergency when the insurer asks.

Three-phase power

New supplies and distribution for equipment, kitchens, compressors and machinery, including isolators, commando sockets and submains.

Faults and breakdowns

Lighting circuits down, a board tripping, a piece of kit that will not run. Diagnosed properly with test gear rather than by swapping parts until something works.

The testing is not optional, and neither is the paperwork.

If you own or operate a commercial premises you have duties under the Electricity at Work Regulations, and separate duties for fire safety under the Regulatory Reform Order. In practice that means the fixed installation gets inspected periodically, emergency lighting gets tested and logged, and the fire alarm gets serviced.

Most businesses find out how seriously this is taken at the worst possible moment, which is when they make a claim. Insurers ask for the current EICR, and a missing or out of date one is a straightforward reason to dispute a payout.

I would rather put you on a sensible cycle and remind you when things are due than turn up after something has gone wrong.

What tends to get missed

  • Emergency lighting logbooks that stopped being filled in years ago.
  • EICRs that expired quietly when the previous manager left.
  • Fire alarm systems extended piecemeal until the original design no longer applies.
  • Equipment added to circuits that were never designed to carry it.
  • Certificates from a fit-out that nobody kept a copy of.
Not sure what you have got? Send me whatever paperwork exists and I will tell you what is current and what is not, at no charge.

How commercial jobs run.

Planned so the premises keeps working.

Site visit

I come and look, take measurements and work out what the job actually involves.

Written quote

Itemised and fixed, with any assumptions spelled out rather than buried.

Scheduled around you

Dates agreed to suit trading, with out of hours arranged where it makes sense.

Handover pack

Certificates, test results and anything your insurer or landlord will want to see.

Commercial questions.

If yours is not here, ring and ask.

Can you work outside our opening hours?

Yes. Most shop and office work is scheduled for evenings, early mornings or quiet days so the premises keeps trading. It is worth saying up front when you enquire, because it changes how the job is planned rather than what it costs.

How often does a commercial property need an EICR?

Usually every five years for most commercial premises, and every three for some higher risk environments. Your insurer or licence conditions may specify a shorter interval, so it is worth checking the policy as well as the regulations.

Whose responsibility is the electrical safety in a leased unit?

It depends on the lease. Typically the landlord holds responsibility for the fixed installation and the common parts, and the tenant for their own equipment and any alterations they have made. Read the lease before assuming, and get a copy of the current EICR either way.

Tell me about the job.

A few details is plenty. I'll come back to you, usually the same day. If it's urgent, ring instead.

07572 642795
I need a name to know who I'm calling back.
I need a number to call you back on.
That address doesn't look right.
Tells me whether you're on my patch.
Just a line about what's needed.

Call Josh Get a quote